China foundry forged products steel knuckle joint cold forging

FOB Reference Price:Get Latest Price
US $1.25-6.35 / Piece | 1000 Piece/Pieces (Min. Order)
Supply Ability:
10000 Ton/Tons per Year
Port:
Qingdao
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shandong, China (Mainland)
Brand Name:
customized
Model Number:
OEM
Product Name:
China foundry forged products steel knuckle joint cold forging
all Material for forging:
aluminum , iron ,steel
surface treatment:
painting, polishing, powder coated
Technology:
forging
machining:
tapping, milling grinding....
tolerance:
+-0.5mm or as drawings
post-process:
heat treatment
Standard or Nonstandard:
nonstandard and customized
certification:
ISO 9001:2008
Packaging & Delivery
Packaging Details
according to customers's requirements.
Delivery Time
Shipped in 45 days after payment
Video Description
Products Detail
China foundry forged products steel knuckle joint cold forging
Product Name
China foundry forged products steel knuckle joint cold forging
Material
Custom
Color
Custom
Standard
ASTM, DIN,JIS, EN, ISO, GB standards
Finished
Polishing, sand blasting, heat treatment, painting, powder coating, anodizing, electroplating, Chrome plating, mirror polishing.
Product
Automotive parts, railroad parts, marine parts, pump body, valve parts, architectural parts
Packaging
Carton Box with Pallet/Wooden Box/Steel Pallet
Certificate
Iso9001:2008
Our Company
Packing & Delivery

Packing Details: Plastic bag, wooden pallet, Delivered bu DHL,FEDEX Or depend on customer's requirement.

Delivery Details: Depend on our customers' desire.

FAQ

Q: How can I get the quotation?

A: Please send us information for quote: drawing, material, weight, quantity and request.

Q: If we don’t have drawing, can you make drawing for me?

A: Yes, we make the drawing of your sample and duplicate the sample.

Q: When can I get the sample?


A: Sample: 25-30 days after you start to make mold. The accurate time depends on your product.

Q: What is your main order time?

A: Order time: 35-40 days after the payment. The accurate time depends on your product.

Q: What is your payment method?

A: Tooling: 100% TT advanced.

     Main order: 50% deposit, balance 50% to be paid before shipment.

Contact us